Mon, Feb 12, 2024
As the Integrated Operations crew races to prep logs for a new heavy lift helicopter, a substitute pilot is tested by the block's postage-stamp sized helipads. In the southern part of the province, the Peters Contract Logging crew moves their 40-year-old yarder onto a new block, but a series of mechanical issues set them back before they even get started.
Mon, Feb 19, 2024
The Duz Cho Logging crew has only days to finish their winter block before the spring thaw destroys the road. During the chaos, a giant sinkhole shuts down production. Meanwhile, Integrated Operations is rushing to find enough salvage wood to keep their jet-powered heavy- lift helicopter busy and affordable. Inland, the Peters Contract Logging crew has a recurring loader problem that forces them to roll the dice with a band-aid bush fix.
Mon, Feb 26, 2024
Summer is in full effect, and that means Integrated Operations is moving into the final phase of their project: loading four million dollars worth of timber onto a giant floating barge. Down south, the clock is ticking for Peters Contract Logging as they continue to deal with their troublesome loader and a raging nearby wildfire.
Mon, Mar 4, 2024
With the entire country experiencing the worst wildfire season in history, the Duz Cho Logging crew races to place a critical bridge on the block. After two months off, Freya Logging moves into their summer block under the threat of a wildfire shutdown. Setting up their high-tech fleet is marred by some unwelcomed ghosts in the machinery.